This project successfully completed a two-phase construction initiative to install 40 Level 2 Electric Vehicle (EV) chargers.
The project was executed across two distinct construction phases. Phase 1 focused entirely on the installation of the foundational electrical infrastructure necessary to support all 40 future chargers. This included the installation of all associated electrical gear (such as panelboards and distribution equipment), the pouring of concrete pads for equipment mounting, the laying of all necessary conduits and conductors from the power source to the charging locations, and the installation of protective bollards around the electrical equipment. Phase 2 then finalized the project by installing and commissioning the 40 Level 2 EV chargers themselves, connecting them to the infrastructure completed in Phase 1. The result is a fully operational and protected charging network of 40 Level 2 stations.